Loading...
520 S SONYA STPermit Types BLO ElE MEC PLM X Permit Number: BLD2024-04847 Issued: 09/13/2024 wntirvii.anaheim.net/building (714)765-4626 Quarter Section: 54 Site Address: 520 S SONYA ST, Anaheim, CA 92802 Legal Description: N TR 9300 BLK LOT 109 APN: 25002303 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Electdcal for Residential EV Charger inside the garage Living Area: Number of Stones: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Permit Applicant Aika BWong Owner WONG, MICHAEL J 520 S SONYA ST Vli 0,00 N/A 171.00 Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNPtt E I M �9` Cityof Anaheim DF O Building Division ' i u ' • FOUNDED raft^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subFloor or pour floor slab until the fellwing applicable items have been sioned,h Building Final (714 765-5157) Last Inspection -Final Only After Above Completed '•7�'F'-S `I/+C�,' _ Plumbing (GroundlUndernoor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/DiaphragmlFrame) Masonry (Reinf./Bond Bea n/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfilf unless sinned off) Sewer Water Engineering Backflow, (Testable Only) Water Seri