230 S VINE ST• Permd Types
BLD ELE MEC FILM CITY OF ANAHEIM
X
BUILDING DIVISION
Permit Number: BLD2024-04948 200 S. ANAHEIM BLVD.
Issued: 09/18/2024 (7141765 - 5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 93
Site Address: 230 S VINE ST, ANAHEIM, CA 92805
Legal Description: N TR 14866 BLK LOT 58
APN: 03715477
Project Description: Reroof: Remove and install (16) sq of composition shingles over the house and attached garage
REF:INV2024-00382
Living Area: Number of Stories: t valuation:
Garage Area' Construction Types:
carport Area: Occupancy Groups:
Balcony / Deck ken: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit:
People Associated with Project:
Permit Applicant Rshim Ghadneh
Owner GHARINEH, RAHIM 8 MICHELLE D 230 S VINE ST
7,500.00
N/A
360.98
Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�pNEIM c9`
City of Anaheim O� iO
Building Division F y
u a
OVNOEO ts�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 766.5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub LisVBus. Lic. (714) 765-6194 (Allow 10 business days)
Setback/Formsn'renches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beensioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
91g
(�
cST""`
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backf I unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service
a
E3
ENt11NEERING, me
September 18, 2024
Architectural and Engineering Services
16541 Gothard St., Suite I08, Huntington Beach, CA 92647
Tel: (909) 538-7067 Email: info@bdpeng.com
Project Address: 230 S Vine St
Anaheim, CA
RE: Reroof done prior to building permit
Dear City of Anaheim Building Official:
I went to the jobsite and performed the structural observation of the roof
installation. The roof installation was inspected and is certified to be in
compliance with requirements of the California Building Code and the
Manufacturer's installation instructions.
Please let us know if you need additional information.
Sincerely,
A,/)-s
Bao Pham, P.E
Principal
Phone: 909-538-7067
Email: bao@bdpeng.com
q_/1%,'74