Loading...
217 N CLEMENTINE STPermit Types BLD 1 EL E MEC PLM X Permit Number: BLD2022-03607 Issued: 08/04/2022 www.a na hei m. net1buiid i ng (714)765-4626 Quarter Section: 72 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Site Address: 217 N CLEMENTINE ST, ANAHEIM, CA 92805 Legal Description: A TR VINEYARD LOT-D-5 BLK F LOT 12 SUB. OF VINEYAR APN:25506218 Project Description: Reroof: Remove existing material, re -sheathe as necessary, and install (20) squares of shingles Living Area: Number of Stories: 1 Valuation: 11,000.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Parrott: 340.43 People Associated with Project: Contractor GG WATER CONSTRUCTION &AMP: MAINTEN 11750 STERLING AVE #F RIVERSIDE, CA Permit Applicant Juan Chavez Owner FARIA JOE E TR 18018 THORNLAKE AVE Owner FARIA JOE E TR 18018 THORNLAKE AVE Type Electrical Fixtures Cry Type Plumbing Fixtures City Mechanical Fixtures Cry The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. City of Anaheim P�r,tiEIM o4 i0 Building Division f y u > �DVA'DED ts�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPE( All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final !`il Cross Connection Control (714) 765-4280 INSFf Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041:pp - Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sinned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned lot Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, filled & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service