215 N CLEMENTINE STPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2022-03606
Issued: 08/04/2022
vnww.anaheim.net/building
(714)765-4626
Quarter Section: 72
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 215 N CLEMENTINE ST, ANAHEIM, CA 92805
Legal Description: A TR VINEYARD LOT-D-5 BILK F LOT 12 SUB. OF VINEYAR
APN: 25506218
Project Description: Retool: Remove existing material, re -sheathe as necessary, and install (16) sq of shingles
Living Area: Number of Stones: i Valuation: 14,500.00
Garage Area: Construction Types: WA
CarportArea: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fen paid for Permit: 340,89
People Associated with Project:
Contractor GG WATER CONSTRUCTION RAMP; MAINTEN 11750 STERLING AVE #F RIVERSIDE, CA
Permit Applicant Juan Chavez
Owner FARIA JOE E TR 18018 THORNLAKE AVE
Owner FARIA JOE E TR 18018 THORNLAKE AVE
Owner FARIA JOE E TR 18018 THORNLAKE AVE
Type Electrical Fixtures Dry Type Plumbing Fixtures Cry Mechanical Fixtures Ory
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
��PHEIM ��`
Cityof Anaheim D4 io
Building Division _� z
>
�DV/yDED vsft^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final PERMIT
EX
IRED
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-504'
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591 DAT E.
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
222-2
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec 8: Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -I Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service