533 E CITY COURTPermit Types
BLD ELE MEC I PLM
X
Permit Number: BLD2023-02434
Issued: 05/17/2023
wvvw.anaheim.net/building
(714)7654626
Quarter Section: 83
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 533 E CITY CT, ANAHEIM, CA 92805
Legal Description: N TR 14268 BLK LOT 2 UN 45 TRACT 14268, LOT 2 OF P
APN: 93014538
Project Description: ReroofRemove existing to install (10) sq of composition shingles over portion of duplex
Living Area: Number of Stories: 2 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Root: Totai Fan mid for Pernik:
N PNE IM
O P \rl p
People Associated with Project: `
Contractor CERTIFIED ROOFING SPECIALISTS 9281 LARKSPUR DRIVE201106221436272010 WESTMINSTER, CA 92683
Permit Applicant Joel Ortiz
Owner MALDONADO, ALBARO It SILVIA 533 E CITY CT
4,500,00
NIA
339.59
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Cry
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�PNEIM C1�
Cityof Anaheim o� i D
Building Division F Z
u '
• �OVNDEO v8�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground ElectrodelUfer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subiloor or pour Floor slab until the follwing applicable items have been
sinned
Building Final (714 765-5163)
Last Inspection -Final Only After Above Completed
FxM
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2n r
oof (Sheathing/D` phragm/Frame)
- 6
Masonry(Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service