Loading...
533 E CITY COURTPermit Types BLD ELE MEC I PLM X Permit Number: BLD2023-02434 Issued: 05/17/2023 wvvw.anaheim.net/building (714)7654626 Quarter Section: 83 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 533 E CITY CT, ANAHEIM, CA 92805 Legal Description: N TR 14268 BLK LOT 2 UN 45 TRACT 14268, LOT 2 OF P APN: 93014538 Project Description: ReroofRemove existing to install (10) sq of composition shingles over portion of duplex Living Area: Number of Stories: 2 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Root: Totai Fan mid for Pernik: N PNE IM O P \rl p People Associated with Project: ` Contractor CERTIFIED ROOFING SPECIALISTS 9281 LARKSPUR DRIVE201106221436272010 WESTMINSTER, CA 92683 Permit Applicant Joel Ortiz Owner MALDONADO, ALBARO It SILVIA 533 E CITY CT 4,500,00 NIA 339.59 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Cry The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PNEIM C1� Cityof Anaheim o� i D Building Division F Z u ' • �OVNDEO v8�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground ElectrodelUfer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subiloor or pour Floor slab until the follwing applicable items have been sinned Building Final (714 765-5163) Last Inspection -Final Only After Above Completed FxM Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2n r oof (Sheathing/D` phragm/Frame) - 6 Masonry(Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service