Loading...
533 S CENTRAL PARK AVE Wit H JffTLF�iF--1:'7MPLM_ X X eFrnit Number: BLD2018-05041 Issued: 02/22/2019,- INSPECTION REQUEST LINE: 1714) 765 - 4626 Quarter Section: 63 / 1piPlii14A pera,t ,C"�(� Site Address: 533 S CENTRAL PARK AVE W Legal Description: TR 3970 LOT 26 AND LOT 27 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Tenant Improvement: Install (5) filtration vents to be suspended from the ceiling. Number of Stories 1 Valuation: $10.000.00 Construcion Types: IIIB, , Fire Sprinklered? No Total Fees paid for Permit: 2.174.60 People Associated with Project: Owner MAHDAD FARD-GHASSEMI 33 MONTCLAIR IRVINE CA 92602-1016 Engineer EDUARDO CHAVEZ 16309 E BENWOOD ST COVINA CA 91722 Permit Applicant EFRAIN FLORES Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty, Ventilation Fan - > 300 cfrn on single duct 5 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_ combo P EI �d Opity of Anaheim O� P bH M `��O Building Division F y �O`NDED � Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items beiow must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final PEPHFF Mechanical Final EX Cross Connection Control (714) 765-4280 11377 EU I It"M Engineering Final (714) 765-5126 1'J LU INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5047 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 DATE \ b Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub Llst/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beer stoned Building Final (714 7655153) -' Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinfdBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing, Only after Plbg., Ele., Mee. & Fire) Insulation (Sound/Energy) Do not tape or piaster until the following appiv --s have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within Z business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service