533 S CENTRAL PARK AVE Wit H
JffTLF�iF--1:'7MPLM_
X X
eFrnit Number: BLD2018-05041
Issued: 02/22/2019,-
INSPECTION REQUEST LINE:
1714) 765 - 4626
Quarter Section: 63 /
1piPlii14A pera,t ,C"�(�
Site Address: 533 S CENTRAL PARK AVE W
Legal Description: TR 3970 LOT 26 AND LOT 27
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Tenant Improvement: Install (5) filtration vents to be suspended from the ceiling.
Number of Stories 1 Valuation:
$10.000.00
Construcion Types:
IIIB, ,
Fire Sprinklered?
No
Total Fees paid for Permit:
2.174.60
People Associated with Project:
Owner MAHDAD FARD-GHASSEMI 33 MONTCLAIR IRVINE CA 92602-1016
Engineer EDUARDO CHAVEZ 16309 E BENWOOD ST COVINA CA 91722
Permit Applicant EFRAIN FLORES
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty,
Ventilation Fan - > 300 cfrn on single duct 5
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_ combo
P EI �d
Opity of Anaheim O� P bH M `��O
Building Division F y
�O`NDED �
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items beiow must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
PEPHFF
Mechanical Final
EX
Cross Connection Control (714) 765-4280 11377
EU I It"M
Engineering Final (714) 765-5126 1'J
LU
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5047
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041 DATE \
b
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub Llst/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beer
stoned
Building Final (714 7655153)
-' Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (ReinfdBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing, Only after Plbg., Ele., Mee. & Fire)
Insulation (Sound/Energy)
Do not tape or piaster until the following appiv --s have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within Z
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service