Loading...
823 S ANAHEIM BLVD 102 (2)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2024-00946 Issued: 03/22/2024 www.anaheim.nettbui (ding (714)765-4626 Quarter Section: 84 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 •5153 Site Address: 823 S ANAHEIM BLVD 102, Anaheim, CA 92805 Legal Description: N TR 17618 BLK LOT 1 UN 40 LOT 1 OF TRACT 17618 OF APN: 93015040 Project Description: Photovoltaic System: Install residential roof mounted solar system with (15) modules and (1) inverter. Living Area: Number of Stones: 2 Valuation: 15,000.00 Garage Area'. Construction Types: NIA CarportArea: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Ccol Roof: Tout Fees paid for Permit: 985.00 People Associated with Project: Contractor BETTER EARTH ELECTRIC INC 16720 MARQUARDT AVENUE SUITE 9081909 CERRITOS, CA 92705 Permit Applicant Mark Hellsund 16720 Marquardt Ave Cerritos, CA 90703 Owner DANG, LOC 823 S ANAHEIM BLVD 102 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Inverter 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. �Pt{EIM Cq Cityof Anaheim oFP (�O Building Division 2 > • 'OVNDED tsh^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 3 ZI tzk ISC /fnn�:f � r' Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do nor install subflooi of pour floor slab unlll the follwing applicable items have been signed Building Final anal my After A Last Inspection -Final Only After Above Completed l LT Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not coves o; conceal the work below intd the following applicable rtens +lave heen Seri list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing f0nly arref Pthg. Ele Mec 9 Fire) Insulation (Sound/Energy) Do nor tape of plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within Z-s business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor hArkfill sinned off (Dr, not unless Sewer Water Engineering Backflow, (Testable Only) Water Service