717 S ANAHEIM BLVD (11)Permit Types
BLD ELE MEC PLM CITY OF ANAHEIM
X
BUILDING DIVISION
Permit Number: BLD2023-05870 200 S. ANAHEIM BLVD.
Issued: 11/07/2023 1714) 765 - 5153
www.anaheim.net/building - #
(714)765-4626
Quarter Section: 84
Site Address: 717 S ANAHEIM BLVD, Anaheim, CA 92805
Legal Description: A TR STUECKLE SUB BILK LOT 5
APN: 25109217
Project Description: Reroof: Remove existing to install (13) sq of capsheet over Flat area
Living Area: Number of Stories: 1 Valuation; 3,000.00
Garage Area: Construction Types: VB
Carport Area: Occupancy Groups:
Balcony / Deck Area; Fire Sprinklered:
Cool Roof: Total Fees paid for Permit: 349,84
People Associated with Project:
Contractor LA ROOFING & BUILDER GROUP INC OB 6800 OWENSMOUTH AVE STE 410 CANOGA PARK, CA 91356
Permit Applicant Jonathan Burgos
Owner GORD, ALEXANDER C 717 S ANAHEIM BLVD
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�t,HEIM oq`
Cityof Anaheim of iO
Building Division i
• �oVNDED tm�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed-
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beensinned
Building Final (714 765-5153)
Last Inspection -Final Only After Above completed
�y
° f'
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistIGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable Items have been signed
Drywall
Drywall Penetrations (Ele, Mee & Ping)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(nn not backfill,mlegg sinned fill
Sewer
Water Engineering Backflow (Testable Only)
Water Service