759 N MAVIS ST 1-4 (3)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-05128
Issued: 09/26/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 82
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
y P�E1H1 E
Site Address: 759 N MAVIS ST 1-4, ANAHEIM, CA 92805
Legal Description: TR 3051 LOT 1 AND LOTS 2 TO 11 INC
APN: 03620412
Project Description: Residential Remodel: Remove and replace 24 windows for apartment complex. REF: BLD2010-00740
Living Area: Number of Stones:
t Valuation:
2,400:00
Garage Area:
construction T es:
yp
Not Applicable
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
No
Cool Roof:
Total Fees paid for permit:
111.00
People Associated with Project:
Permit Applicant lonut Rus
Owner STRATTFORD MAVIS LLC
18831 VON KARMAN AVE 350
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
�PHEIM c�
Cityof Anaheim D� t C'�O
Building Division F i
>
• DVNDED vs�^
Do not occupy this buildino until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-6041
INSPECTION
DATE
INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
SetbacklFormslTrenches (Footings)
COAIMigation Measures
Do not install subtloor or pour Boor slab until the follwing applicable items have been
sioned
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
u
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Flog., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service