Loading...
759 N MAVIS ST 1-4 (3)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-05128 Issued: 09/26/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 82 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765. 5153 y P�E1H1 E Site Address: 759 N MAVIS ST 1-4, ANAHEIM, CA 92805 Legal Description: TR 3051 LOT 1 AND LOTS 2 TO 11 INC APN: 03620412 Project Description: Residential Remodel: Remove and replace 24 windows for apartment complex. REF: BLD2010-00740 Living Area: Number of Stones: t Valuation: 2,400:00 Garage Area: construction T es: yp Not Applicable Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: No Cool Roof: Total Fees paid for permit: 111.00 People Associated with Project: Permit Applicant lonut Rus Owner STRATTFORD MAVIS LLC 18831 VON KARMAN AVE 350 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. �PHEIM c� Cityof Anaheim D� t C'�O Building Division F i > • DVNDED vs�^ Do not occupy this buildino until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-6041 INSPECTION DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) SetbacklFormslTrenches (Footings) COAIMigation Measures Do not install subtloor or pour Boor slab until the follwing applicable items have been sioned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed u Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Flog., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service