985 S LADAN LN (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-02637
Issued: 05/22/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 221
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 985 S LADAN LN, ANAHEIM, CA 92808
Legal Description: N TR 13461 BLK LOT 22
APN: 35429104
Project Description: Residential Remodel: To replace (2) retro-fit windows and (2) sliding doors
Living Area: Number of Stones: 1 Valuation: 18,637.00
Garage Area: Construction Types: VB
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit: 172.00
People Associated with Project:
Contractor HOME DEPOT USA INC DBA THE HOME DEPO P O BOX 105451 ATTN LICENSE MANAGEMENT 200408130950507570 ATLANTA, GA 9280
Permit Applicant Jeffrey Pao
Owner ZADEH, SHAHRAM TR ZADEH 985 S LADAN LN
Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
r,NElm
City of Anaheim ��,r.
Building DIVISION i
<o1j--_ED
A'DED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.6041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (GroundlUndernoor Drain Waste)
Water Engineering (714) 766.4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 7665194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 76"'163)
Last Inspection -Final Only After Above Completed
-
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist(Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been saned
list Floor Shear
Firesprinkler(Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)