Loading...
985 S LADAN LN (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-02637 Issued: 05/22/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 221 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 985 S LADAN LN, ANAHEIM, CA 92808 Legal Description: N TR 13461 BLK LOT 22 APN: 35429104 Project Description: Residential Remodel: To replace (2) retro-fit windows and (2) sliding doors Living Area: Number of Stones: 1 Valuation: 18,637.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 172.00 People Associated with Project: Contractor HOME DEPOT USA INC DBA THE HOME DEPO P O BOX 105451 ATTN LICENSE MANAGEMENT 200408130950507570 ATLANTA, GA 9280 Permit Applicant Jeffrey Pao Owner ZADEH, SHAHRAM TR ZADEH 985 S LADAN LN Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. r,NElm City of Anaheim ��,r. Building DIVISION i <o1j--_ED A'DED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (GroundlUndernoor Drain Waste) Water Engineering (714) 766.4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 7665194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 76"'163) Last Inspection -Final Only After Above Completed - Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist(Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been saned list Floor Shear Firesprinkler(Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service