Loading...
924 S CAMERFORD LNPermit Types BLD ELE MEC PLM X X Permit Number: BLD2024-03776 Issued: 09/19/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 221 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 924 S CAMERFORD LN, ANAHEIM, CA 92808 Legal Description: N TR 13459 BLK LOT 6 APN: 35435106 Project Description: Photovoltaic System: Install residential roof mounted solar system with (25) modules, (1) inverter, 125amp subpanel and (1) ESS. Living Area: Number of Stories: 0 Valuation, 40,000.00 Garage Area: Construction Types: VB Carpon Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof Total Fees paid for Permit: 1,240.70 People Associated with Project: Contractor SOLARGEM ELECTRICAL 10808 FOOTHILL BLVD #160 241201506051258184353 RANCHO CUCAMONGA, CA 91730 Permit Applicant Joseph EdwarclJohnson Owner BAIG, MUSARRAT N TR BAIG 924 S CAMERFORD LN Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Cry ESS (Battery Storage) 1 Inverter 1 Sub PanelRemp Pwr- Under 600 V, up to 1 200 amps The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PNP"El z Cityof Anaheim OF �O Building Division Z p ' �pgNDED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765.6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714766-5153) Last Inspection -Final Only Aker Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Flbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service