924 S CAMERFORD LNPermit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2024-03776
Issued: 09/19/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 221
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 924 S CAMERFORD LN, ANAHEIM, CA 92808
Legal Description: N TR 13459 BLK LOT 6
APN: 35435106
Project Description: Photovoltaic System: Install residential roof mounted solar system with (25) modules, (1) inverter, 125amp subpanel
and (1) ESS.
Living Area: Number of Stories:
0 Valuation, 40,000.00
Garage Area:
Construction Types: VB
Carpon Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof
Total Fees paid for Permit: 1,240.70
People Associated with Project:
Contractor SOLARGEM ELECTRICAL
10808 FOOTHILL BLVD #160 241201506051258184353 RANCHO CUCAMONGA, CA 91730
Permit Applicant Joseph EdwarclJohnson
Owner BAIG, MUSARRAT N TR BAIG
924 S CAMERFORD LN
Type Electrical Fixtures City Type
Plumbing Fixtures Oty Mechanical Fixtures Cry
ESS (Battery Storage) 1
Inverter 1
Sub PanelRemp Pwr- Under 600 V, up to 1
200 amps
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNP"El z
Cityof Anaheim OF �O
Building Division Z
p '
�pgNDED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.6126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714766-5153)
Last Inspection -Final Only Aker Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Flbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service