Loading...
308 E KATELLA AVEPermit Types BLD EL E MEC PLM X Permit Number: BLD2022-03977 Issued: 07/20/2022 wvvw.anaheirn.net/building (714)765-4626 Quarter Section: 98 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 308 E KATELLA AVE, ANAHEIM, CA 92802 Legal Description: APN:13732190 Project Description: Antenna Cell Site: Modification to existing antenna cell site for "T-Mobile". Living Area: Number o/ Stones: 0 Valuation: 25,000.00 Garage Area: Construction Types: Not Applicable Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for pertnh: 105,00 People Associated with Project: Permit Applicant Mohammad Daneshmand Owner MAKAN HOSPITALITY INC SUITE 400 17100 PIONEER BLVD ARTESIA, CA 90701 Type Electrical Fixtures City Type Plumbing Fixtures city Mechanical Fixtures city The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A now permit is required to commence or continue work. PNhHEI,N �q< Cityof Anaheim O4 iO Building Division _� i > 11 �OGNDED vm�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the tollwing applicable items have been sioned Building Final (714 765.6153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been spaned tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg . Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor fQn not hackfillunips, signed off) Sewer Water Engineering Backflow (Testable Only) Water Service