147 S WESTCHESTER DRPermit Types
BLD IELE MEC PLM
X
Permit Number: BLD2021-05322
Issued: 08/30/2022
www.anaheim.net/building
(714)765-4626
Quarter Section: 5
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
Site Address: 147 S WESTCHESTER DR, ANAHEIM, CA 92804
Legal Description: S TWP 4 RGE 11 SEC 14 T 4 R 11 SEC 14 POR NW1/4
APN: 13531118
Project Description: EV Charger: Install (3) Level 2 dual car charger, new 400 amp dual meter, (2) new pole 40A breakers in existing
exterior parking spots
Living Area: Numberof Stories:
0 Valuation:
15,000.00
Garage Area:
Construction Types:
NIA
CarportArea:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
No
Cool Roof:
Total Fees paid for Permit:
2,630.96
People Associated with Project:
Permit Applicant robert wllliamstretz
Owner JGKALLINS INVESTMENTS LP
3720 S SUSAN ST 100
Contractor MOTIVE ENERGY TELECOMMUNICATIONS
GR 755 TRADEMARK CIRCLE CORONA, CA 92879
Architect Jeffrey L Rome
17260 NEWHOPE STREET FOUNTAIN VALLEY, CA 92708
Type Electrical Fixtures Oty Type
Plumbing Fixtures City Mechanical Fixtures
Cry
EV Charger 3
Meter/Disc Sw- Under 600 V, up to 200 2
amps
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
�tMetAt P�q<
Cityof Anahei m OF iO
Building Division ti Z
• �OVNDEO lsh^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
1J<
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed -
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (GroundlUnderFloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Ping Ele Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service