125 N MERRIMAC DRPenh Types
BLD EL E MEC PLM
X
Permit Number: BLD2024-03123
Issued: 09/09/2024
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 156
She Address: 125 N MERRIMAC DR, ANAHEIM, CA 92807 -
Legal Description: N TR 5063 BLK LOT 4 TR 5063 LOT 4 ALL -EX SELY 55
APN: 36019129
Project Description: Repair: Repair to second floor balcony at unit #C only.
Lying Area:
Garage Area:
Carport Area:
Balcony / Deck Area:
Cool Roof:
Number of Stories:
2 Valuation:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Penh:
People Associated with Project:
Permit Applicant Bruce Switzk
Owner SWITZKY, BRUCE S TR B R 3671 BLUEBELL ST
Engineer - Civil KAMALEDDIN MIRMOHAMMADSADEGHI 1415 WARNER AVE STE B TUSTIN, CA 92780
5,000.00
Va
No
1,717.90
Type Electrical Fixtures City Type Plumbing Fixtures Cry Mechanical Fixtures Cry
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNr,HEIM C7<
City of Anaheim O� iO
Building Division f i
>
�06NDED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 7665126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
V/L3/M
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor.(Floor Nailing)z-
a
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
I3
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
/ a
JSG
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mee.)
Grease Interceptor
(Do not backfill unless oned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service