Loading...
125 E BALL RDPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-02965 Issued: 08/29/2024 www.anaheim.net/bulding (714)765-4626 Quarter Section: 85 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Site Address: 125 E BALL RD, ANAHEIM, CA 92805 Legal Description: A TR ANAHEIM EXT BILK LOT 25 ANAHEIM EXT LOT 25 1.3 APN: 23416104 Project Description: Demolition: 10,530 sq It demolition of warehouse building with foundation to be removed and utilities to be capped. Living Area: Number of stories: 2 Valuation: 80,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: No Cool Roof: Total Fees paid for Per nk: 1.43929 People Associated with Project: Permit Applicant DAVID CHU 3000 E Coast Hwy Corona del Mar, CA 926252209 Owner CHU, MARCUS D 8 TRACEY 53 STANZA Architect WILING JIN SEC, 86 QUAIL CANYON irvine, CA 92618 Type Electrical Fixtures Oty Type Plumbing Fixtures Cry Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PN Pt1EIM �qt Cityof Anaheim O4 iO Building Division _� 0 - �oLA'DED teF1 Do not occupy this buildin t until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days) Setback/FormslTrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sion Building Final (714 765.5153) Last Inspection -Final Only After Above Completed. /` Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mac.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service