837 N LEMON STPermit Types
BLD EL E MEC PLM
X
Permit Number: BLD2022-00639
Issued: 02/14/2022
www.anaheim.net/building
(714)765-4626
Quarter Section: 71
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 837 N LEMON ST, ANAHEIM, CA 92805
Legal Description: N TR 399 BLK A LOT 10
APN: 03424421
Project Description: Reroof: Tear off existing material and resheath
as needed to install (980) sq ft of composition shingle over portion of
house
Living Area: Number of Stones:
1 Valuation:
2,000.00
Garage Area:
Construction Types:
N/A
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
No
Cool Roof.
Total Fe s, paid for permit:
339.50
People Associated with Project:
Permit Applicant Sohrab Khosraviani
Owner KHOSRAVIANI SOHRAB TR
837 N LEMON ST
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
4NPt{Elryt rq\
City of Anahei m o� io
Building Division F 2
v a
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete wvd the following applicable items have been signed-
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Formslrrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714765-5153)
Last Inspection -Final Only After Above Completed
-3/1b12t
Ix ,AA]
UId
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1 st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
a�LS 11.
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not hnckf 11 urI sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service