Loading...
827 N LEMON ST (2)Permit Types BLD ELE MEC PLM X X X Permit Number: BLD2021-0490D Issued: 11/08/2021 www.anaheim.net/building (714)7654626 Quarter Section: 71 Site Address: 827 N LEMON ST Legal Description: N TR 399 BLK A LOT 7 APN: 03424418 CITY OF ANAHEIM BUILDING DWISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Project Description: Residential Remodel: New tile at shower. Plumbing and electrical for master bathroom remodel. Living Area: Number of Stones: 0 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roar: Total Fees paid for Perms: People Associated with Protect: Contractor MILLER 8 SONS CONSTRUCTION GROUP 17595 HARVARD AVE #282 IRVINE, CA 92614 Permit Applicant Meytal Naim Owner GUADRON JORGE TR THE J 827 N LEMON ST y� 7,200.00 NIA 275.94 Type Electrical Fixtures Oly, Type Plumbing Fixtures Oty Mechanical Fixtures 04 Receptacle, switches, lights 10 Bath Tub 1 Shower 1 The permit shall expire by limitation and become null and void N the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. PaPNEIM c�` Cityof Anaheim D� iO Building DIVISION F i > 10 DED 57 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final INSPECUON Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 76 1 4-4 i7 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) - 4 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 7655041 Plumbing (GroundlUnderfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-6194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been saned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) /) a I J 5C Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Pfbg., Ele.. Mad. & Fire) Insulation (Sound/Energy) - Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service