827 N LEMON ST (2)Permit Types
BLD
ELE
MEC
PLM
X
X
X
Permit Number: BLD2021-0490D
Issued: 11/08/2021
www.anaheim.net/building
(714)7654626
Quarter Section: 71
Site Address: 827 N LEMON ST
Legal Description: N TR 399 BLK A LOT 7
APN: 03424418
CITY OF ANAHEIM
BUILDING DWISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Project Description: Residential Remodel: New tile at shower. Plumbing and electrical for master bathroom remodel.
Living Area: Number of Stones: 0 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Roar: Total Fees paid for Perms:
People Associated with Protect:
Contractor MILLER 8 SONS CONSTRUCTION GROUP 17595 HARVARD AVE #282 IRVINE, CA 92614
Permit Applicant Meytal Naim
Owner GUADRON JORGE TR THE J 827 N LEMON ST
y�
7,200.00
NIA
275.94
Type Electrical Fixtures Oly, Type Plumbing Fixtures Oty Mechanical Fixtures 04
Receptacle, switches, lights 10 Bath Tub 1
Shower 1
The permit shall expire by limitation and become null and void N the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
PaPNEIM c�`
Cityof Anaheim D� iO
Building DIVISION F i
>
10 DED 57
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final INSPECUON
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 76 1 4-4
i7
INSPECTION
DATE INSPECTOR
Fire Sprinkler (ONLY) (714) - 4
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 7655041
Plumbing (GroundlUnderfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-6194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been saned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
/) a I
J 5C
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Pfbg., Ele.. Mad. & Fire)
Insulation (Sound/Energy) -
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service