546 S LEMON STPermit Types
BLD 1 ELE MEC PLM
X
Permit Number: BLD2023-00341
Issued: 01/23/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 84
Site Address: 546 S LEMON ST, ANAHEIM, CA 92805
Legal Description: N TR 212 BLK LOT 5
APN: 25107107
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD,
(714) 766.5153
Project Description: Reroof: Overlay (18) sq of composition shingles over existing single layer of entire house
Living Area: Number of Stories: 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire aprinklered:
Cod Root Total Fees paid for Permk:
People Associated with Project:
Permit Applicant Henryk Klimas
Owner KLIMAS HENRVK 546 S LEMON ST
5,500.00
N/A
340.72
Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
*NpHEIM cqt
City of Anaheim p� iO
Building Division' 2
IDS
SOUNDED tag'^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
F7PI
RED
Mechanical Final PTS-P-E
C
Cross Connection Control (714) 7 OT CqjApl_
Engineering Final (714) 765-5126
INSPECTION
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 76 -
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-6194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor Of pocr floor slab until the follwing applicable items have been
�tunecl
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not _ever or conceal the work below unlil the following applicable tems have
it
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd F Shear
o (Sheathing/ aphragm/Frame) 4ec
#rftMffqTWeinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Plbg Be Mec & Fire)
Insulation (Sound/Energy)
Do not tape w plasler untii the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business hays after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ell or Mec.)
Grease Interceptor
r.
Sewer
Water Engineering Backflow (Testable Only)
Water Service