313 S LEMON ST (2)Permit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: OLD2022.00418
Issued: 01/31/2022
www.anaheim.net/building
(714)765.4626
Quarter Section: 73
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 • 5153
Site Address: 313 S LEMON ST, ANAHEIM, CA 92805
Legal Description: A TR STROBEL, ESTATE OF MARY BLK LOT 20 STROBEL HO
APN: 03620307
Project Description: Residential Remodel: Replace (2) retrofit window and water heater on side of property
Living Area: Number of Stories: 1 Valuation:
0.00
Garage Area: Construction Types:
NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire SpnnklereC
No
Cool Roar Total Fos paid for Perms:
167.00
People Associated with Project:
Contractor FUTURA ENERGY INC 13142 BARTON RD SANTA FE SPRINGS, CA 9D605
Permit Applicant Desiree Clayton
Owner MADAN A K TR MADAN PO BOX 92345
Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures
City
Water Heater 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PN p,H El M CqC
City of Anaheim F i�
Building Division
>
OVNOEO �t"
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Final Gas Test
Electrical Final
t� titi
n�
5 14ra
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lip. (714) 765-5194 (Allow 10 business days)
Setback/Forms/irenches (Footings)
COAIMigalion Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beens pried
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
_
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistlGirders)
Undertloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound[Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Eli or Mee.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service