Loading...
313 S LEMON ST (2)Permit Types BLD ELE MEC PLM X X Permit Number: OLD2022.00418 Issued: 01/31/2022 www.anaheim.net/building (714)765.4626 Quarter Section: 73 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 • 5153 Site Address: 313 S LEMON ST, ANAHEIM, CA 92805 Legal Description: A TR STROBEL, ESTATE OF MARY BLK LOT 20 STROBEL HO APN: 03620307 Project Description: Residential Remodel: Replace (2) retrofit window and water heater on side of property Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire SpnnklereC No Cool Roar Total Fos paid for Perms: 167.00 People Associated with Project: Contractor FUTURA ENERGY INC 13142 BARTON RD SANTA FE SPRINGS, CA 9D605 Permit Applicant Desiree Clayton Owner MADAN A K TR MADAN PO BOX 92345 Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures City Water Heater 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PN p,H El M CqC City of Anaheim F i� Building Division > OVNOEO �t" Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Final Gas Test Electrical Final t� titi n� 5 14ra Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lip. (714) 765-5194 (Allow 10 business days) Setback/Forms/irenches (Footings) COAIMigalion Measures Do not install subfloor or pour floor slab until the follwing applicable items have beens pried Building Final (714 765-5153) Last Inspection -Final Only After Above Completed _ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Undertloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound[Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Eli or Mee.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service