Loading...
310 S LEMON STPermit Types BLD ELEI MEC I PLM X Permit Number: BLD2022-04134 Issued: 09/01/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 84 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 310 S LEMON ST, ANAHEIM, CA 92805 Legal Description: A TR ORIGINAL CITY LOTS-ANAHEIM BLK LOT 52 APN: 03702120 Project Description: Commercial Reroof: Remove existing material, re -sheathe as necessary, and install (21) squares of composition shingles over pitched area on the south side of church Living Area: Number of Stories: 2 Valuation: 24,000.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Faaa paid for Perma: 342.12 People Associated with Project: Permit Applicant Jose Zenneno Owner CHURCH BETHEL BAPTIST PO BOX 14 Type Electrical Fixtures City Type Plumbing Fixtures Qty Meehanlui Fixtures Qty The permit shall expire by limitation and become null and Vold if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNp EIM �I Cityof Anaheim of io Building Division f i U > •�oUNDED t^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECT All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final EERMIT EX 1-Lj Cross Connection Control (714) 765426 I N Engineering Final (714) 765-5126 TLFn INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-45 r Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-6194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been i n Building Final (714 765-5153) Last Inspection -Final Only Aker Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work hero* until the following applicable items have slurredbeen 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd F ar of ( heat ng/Diaphragm/Frame) n einf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plhg.. Ele.. Mec & Piie Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Flog) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -,Meter will be set within 2-3 business days after approvah Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service