Loading...
871 S OLIVE STPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-04831 Issued: 09/12/2024 www.anaheim.net/building (714)7654626 Quarter Section: 85 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 871 S OLIVE ST, Anaheim, CA 92805 Legal Description: A TR WEIGHT, FREEMAN d MC CLOUGHANS SUB BLK LOT 3 APN: 03709322 Project Description: Residential Remodel: To replace (11) squares of stucco around the house Living Area: Number of Stories: 1 Valuation: Garage Area: Construction Types: CarportArea: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Root: Total Fees paid for Permit: People Associated with Project: Permit Applicant Berenice Abazan Owner MARTINEZ, DOLORES TR 871 S OLIVE ST 2,500,00 N/A 635.33 Type Electrical Fixtures Oty Type Plumbing Fixtures Dty Mechanical Fixtures Oty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. �aPHEIM Cityof Anaheim OF c.�It io Building Division f z v 1>1 �OUNDEp va`t^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed JJ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele.. Mec. & Fire) Insulation(Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath isc Electrical Ins pections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) / T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service