Permit Number: BLD2024-04831
Issued: 09/12/2024
www.anaheim.net/building
(714)7654626
Quarter Section: 85
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 871 S OLIVE ST, Anaheim, CA 92805
Legal Description: A TR WEIGHT, FREEMAN d MC CLOUGHANS SUB BLK LOT 3
APN: 03709322
Project Description: Residential Remodel: To replace (11) squares of stucco around the house
Living Area: Number of Stories: 1 Valuation:
Garage Area: Construction Types:
CarportArea: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Root: Total Fees paid for Permit:
People Associated with Project:
Permit Applicant Berenice Abazan
Owner MARTINEZ, DOLORES TR 871 S OLIVE ST
2,500,00
N/A
635.33
Type Electrical Fixtures Oty Type Plumbing Fixtures Dty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
�aPHEIM
Cityof Anaheim OF c.�It io
Building Division f z
v 1>1
�OUNDEp va`t^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
I DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
JJ
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele.. Mec. & Fire)
Insulation(Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
isc
Electrical Ins pections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
/
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sioned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service