Loading...
630 S KNOTT AVE 9-12r Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-06654 Issued: 12/14/2023 www.ana helm. net/building (714)765-4626 Quarter Section: 6 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Site Address: 630 S KNOTT AVE 9-12, Anaheim, CA 92804 Legal Description: N TR 5107 BLK LOT 1 UN 17 TR 5107 LOT 1 UNIT 17 L, APN: 93620017 Project Description: Reroof: Remove existing to install (29) sq of composition shingles over (units #65-68) Living Area: Number of Stones: 1 Valuation: 15,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof. Total Fees paid for Permit: 353.20 People Associated with Project: Contractor CASSADY ROOFING INC 13021 LAKELAND ROAD SANTA FE SPRINGS, CA 90670 Permit Applicant Efrain Chavez Owner ALBRIGHT. LAURA SUMMER 630 S KNOTT AVE 17 Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. I ,A EIM C.qC Cityof Anaheim O� io Building Division F z U ' �gVtypED vsy^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloof of pow floor slab until the follwing applicable items have been ,.rrr,.d1 Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 4 /il �yY Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned fat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing jOnly after Ping Ere Mec 6 Frre) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec 8 Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service