630 S KNOTT AVE 9-12r
Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2023-06654
Issued: 12/14/2023
www.ana helm. net/building
(714)765-4626
Quarter Section: 6
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Site Address: 630 S KNOTT AVE 9-12, Anaheim, CA 92804
Legal Description: N TR 5107 BLK LOT 1 UN 17 TR 5107 LOT 1 UNIT 17 L,
APN: 93620017
Project Description: Reroof: Remove existing to install (29) sq of composition shingles over (units #65-68)
Living Area: Number of Stones: 1 Valuation: 15,000.00
Garage Area: Construction Types: VB
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Roof. Total Fees paid for Permit: 353.20
People Associated with Project:
Contractor CASSADY ROOFING INC 13021 LAKELAND ROAD SANTA FE SPRINGS, CA 90670
Permit Applicant Efrain Chavez
Owner ALBRIGHT. LAURA SUMMER 630 S KNOTT AVE 17
Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
I ,A EIM C.qC
Cityof Anaheim O� io
Building Division F z
U '
�gVtypED vsy^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloof of pow floor slab until the follwing applicable items have been
,.rrr,.d1
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
4 /il
�yY
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
fat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing jOnly after Ping Ere Mec 6 Frre)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec 8 Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service