Loading...
720 S MAGNOLIA AVE (2)r Permit Types LLD EL E MEC PLM X Permit Number: BLD2024.04914 Issued: 09117/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 28 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 - 5153 Site Address: 720 S MAGNOLIA AVE, ANAHEIM, CA 92804 Legal Description: S TWP 4 RGE 10 SEC 18 T 4 R 10 SEC 18 POR SW1/4 APN: 12717146 Project Description: Reluuf Remove and install (40) sq of composition over the peaked portion of the structure Living Area: Number of Stories: 4 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spdnklered: Cool Roof: Total Fees paid for Permit: r a 1 1 a�. I People Associated with Project: Contractor PREFERRED ROOFING 3419 VIO LID0201903210916593850 NEWPORT BEACH, CA 92665 Permit Applicant Eric Jacoby Owner CHURCH, MAGNOLIA BAPTIST OF ANAHEIM 720 S MAGNOLIA ST 45,000.00 N/A 394.60 Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PAP Cq` B. t� ity of Anaheim O� ti EIM i - Building Division -A u i FOMOEO �8�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 7665163) Last Inspection -Final Only After Above Completed \ \0 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been started. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) \O'� Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service