Loading...
634 S WAYSIDE ST (9)Permit Types BLD ELE MEC PLM X X X Permit Number: BLD2022-03830 Issued: 08/17/2022 www.anaheim.net/lbuilding (714)765-4626 Quarter Section: 104 Site Address: 634 S WAYSIDE ST, ANAHEIM, CA 92805 Legal Description: N TR 3392 BLK LOT 8 APN: 08253109 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Remodel: Replace wall framing, remove existing tub and replace with walk in tub, install (1) 20amp receptacle. Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area'. Construction Ty pes: WA Carport Area'. Occupancy Groups: Balcony I Deck Area: Fire Spnnkbred: Cool Roof. Total Fee. .to for Parma: 387.00 People Associated with Project: Contractor SAFE STEP WALK IN TUB LLC 12500 JEFFERSON AVE NEWPORT NEWS, VA 23602 Persil Applicant Diamond Murphy Owner KISSLING MARGARET J 8 DANIEL J 634 S WAYSIDE ST Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty Receptacle, switches, lights 1 Bath Tub 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. '�pHEIM ��< Cityof Anaheim o� io Building Division F Z v ' �OVNDEp 18`'^ Do not occupy this buildino until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final !2 zi Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable Items have been ianed Building Final (714765.5153) Last Inspection -Final Only After Above Completed �..ry Plumbing (Ground/Undernoor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cove or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor inn not harkfill unless sinner! off) Sewer Water Engineering Backflow (Testable Only) Water Service