Loading...
131 N WADE CIR (2)Permit Types BLD 1 ELE MEC PLM X Permit Number: BLD2022-00578 Issued: 05/12/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 179 Site Address: 131 N WADE CIR, ANAHEIM, CA92807 Legal Description: N TR 6717 BLK LOT 17 APN: 35804117 CITY OF ANAHEIM Project Description: Retaining Wall: 50 L.F. x 5.4 retaining wall Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Root Number of Stones: BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 0 Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Told Fees paid for Permit: People Associated with Project: Permit Applicant Sheri Zimchky Owner ZIRSCHKY CHRISTOPHER ALAN TR THE ZIRS 131 N WADE CIR Engineer - Civil CHRISTOPHER J BIEDENBACH 1201 N TUSTIN AVE201107051050079050 ANAHEIM, CA 92807 7,000.00 NIA No 627SI Type Electrical Fixtures Cry Type Plumbing Fixtures City Mechanical Fixtures Oty The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. City of Anaheim PiPHEIM �qC O4 i0 Building Division z v a o�NOEo kaa Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7664260 Engineering Final (714) 765-5126 INSPECTION DATE FINSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus, Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor stab until the follwing applicable items have been signed Building Final (714 765.5153) Last Inspection -Final Only After Above Completed d I� Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Si z Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Plbg Ele Mec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do nol i i Sewer Water Engineering Bel (Testable Only) Water Service