131 N WADE CIR (3)Permit Types
CITY OF ANAHEIM
BLD ELE ME C PLM
x
BUILDING DIVISION
Permit Number: BLD2022-00578 200 S. ANAHEIM BLVD.
Issued: 05/12/2022 (714) 765 - 5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 179
Site Address: 131 N WADE CIR, ANAHEIM, CA 92807
Legal Description: N TR 6717 BLK LOT 17
APN: 35804117
Project Description: Retaining Wall: 50 L.F. x 5.4 retaining wall
Living Area: Number of Stories: 0
Valuation:
Garage Area:
Construction Types:
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered.
Cool Roof: Total
Fees paid for permit
People Associated with Pro)ect:
Permit Applicant Sheri 2rechky
Owner ZIRSCHKY CHRISTOPHER ALAN TR THE ZIRS 131 N WADE CIR
Engineer - Civil CHRISTOPHER J BIEDENBACH 1201 N TUSTIN AVE201107051050079050 ANAHEIM, CA 92807
7,000.00
NIA
No
62➢ 91
Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Cry
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
�NPHEIM ��`
Cityof Anaheim o4 iO
Building Division F 2
u '
SOUNDED tad^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Formsrrrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the tollwing applicable items have been
s dried
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele,. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service