Loading...
131 N WADE CIR (3)Permit Types CITY OF ANAHEIM BLD ELE ME C PLM x BUILDING DIVISION Permit Number: BLD2022-00578 200 S. ANAHEIM BLVD. Issued: 05/12/2022 (714) 765 - 5153 www.anaheim.net/building (714)765-4626 Quarter Section: 179 Site Address: 131 N WADE CIR, ANAHEIM, CA 92807 Legal Description: N TR 6717 BLK LOT 17 APN: 35804117 Project Description: Retaining Wall: 50 L.F. x 5.4 retaining wall Living Area: Number of Stories: 0 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered. Cool Roof: Total Fees paid for permit People Associated with Pro)ect: Permit Applicant Sheri 2rechky Owner ZIRSCHKY CHRISTOPHER ALAN TR THE ZIRS 131 N WADE CIR Engineer - Civil CHRISTOPHER J BIEDENBACH 1201 N TUSTIN AVE201107051050079050 ANAHEIM, CA 92807 7,000.00 NIA No 62➢ 91 Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Cry The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. �NPHEIM ��` Cityof Anaheim o4 iO Building Division F 2 u ' SOUNDED tad^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the tollwing applicable items have been s dried Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele,. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service