863 S PARKGLEN PL (2)Permit Types
LLD 1 ELE MEC FILM
X
Permit Number: BLD2024-02914
Issued: 06/06/2024
vivinw.anaheim.net/building
(714)765-4626
Quarter Section: 220
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
PN AHEI /
F•
%D
V
�' r
Site Address: 863 S PARKGLEN PL, ANAHEIM, CA 92808 -
Legal Description: N TR 12992 BLK LOT 20
APN: 35438130
Project Description: Residential Remodel: Replace (15) retrofit windows
Living Area: Number of Stories:
1 valuatiom
12.750.00
Garage Area:
Construction Types:
N/A
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Spnnklered:
No
Cool Roof:
Total Fees paid for Permit:
329.66
People Associated with Project:
Contractor RENEWAL BY ANDERSEN LLC 22982 ALCALDE DR201407031118596237
LAGUNA HILLS, CA 92653
Permit Applicant Marcos Pineda
Owner PITZER, MARK T TR PITZER 863 S PARKGLEN PL
Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed Final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PHPHEIM oq(
City of Anaheim o� !O
Building Division F' z
OUNDEO tah^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwng applicable items have been
sianed
Building Final (714 765.6153)
Last Inspection -Final Only After Above Completed
r1
IV
'
)`mot
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinl
Floor (JoistlGirdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/DiaphragmlFrame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following appl,cau-e hems gave been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Bill (Testable Only)
Water Service