Loading...
539 S MORNINGSTAR DRPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-04653 Issued: 09/05/2024 www.anaheim. neUbuilding (714)765-4626 Quarter Section: 225 011 CITY OFIiANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Site Address: 539 S MORNINGSTAR DR, ANAHEIM, CA 92808 Legal Description: N TR 12988 ELK LOT 45 APN: 35423322 Project Description: Residential EV Charger Level 2 Living Area: Number of Stories: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: 7-7 'tea Valuation: 0.00 construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permh: 177,00 People Associated with Project: Contractor TROUT ELECTRIC 2020 IOWA AVE,SUITE 102 RIVERSIDE, CA 92504 Permit Applicant TROUT ELECTRIC 17843 GLEN HOLLOW WAY RIVERSIDE, CA 92504 0000 Type Electrical Fixtures Qty Type Plumbing Fixtures Qry Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. HPt{E IM cq City of Anaheim F P ��T o g Building Division F i • SOUNDED ���^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final �II'' /� hlq Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 INSPECTION DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-6041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-0591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been ned. Building Final (714 765-5153) Last Inspection -Final Only Aker Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Flog., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct, Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service