746 1/2 N CLAUDINA STPermit Types
CITY OF ANAHEIM
BLD I ELE MEC I PLM I
XI I I
BUILDING DIVISION
Permit Number: BLD2024-04994 200 S. ANAHEIM BLVD.
Issued: 09/19/2024 (714) 765 - 5153
www.anaheim.net/building
(714)766-4626
Quarter Section: 82
Site Address: 746 112 1/2 N CLAUDINA ST, ANAHEIM, CA 92805
Legal Description: N TR 158 BLK B LOT 4
APN: 03508403
Project Description: Electrical: Main panel upgrade 125 amps
Living Area: Number of Stones: 0
Valuation:
Garage Area:
Construction Types:
carport Area',
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Rcot Total
Fees paid for Penult:
People Associated with Project
11111 I \•
_
0.00
NIA
177.00
Permit Applicant Jose Muniz
Owner MUNIZ, JOSE 746 N CLAUDINA ST
Type Electrical Fixtures Qty Type Plumbing Fixtures Orly Mechanical Fixtures Oty
Meter/Disc Sw - Under 600 V, up to 200 1
amps
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
T�PHEIM Oq<
Cityof Anaheim O� i0
Building DIVISIOn F i
DIED'
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
10-10-Ltd
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-5153)
last Inspection -Final Only After Above Completed
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been soned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
! Z
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mac.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service