Loading...
746 1/2 N CLAUDINA STPermit Types CITY OF ANAHEIM BLD I ELE MEC I PLM I XI I I BUILDING DIVISION Permit Number: BLD2024-04994 200 S. ANAHEIM BLVD. Issued: 09/19/2024 (714) 765 - 5153 www.anaheim.net/building (714)766-4626 Quarter Section: 82 Site Address: 746 112 1/2 N CLAUDINA ST, ANAHEIM, CA 92805 Legal Description: N TR 158 BLK B LOT 4 APN: 03508403 Project Description: Electrical: Main panel upgrade 125 amps Living Area: Number of Stones: 0 Valuation: Garage Area: Construction Types: carport Area', Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Rcot Total Fees paid for Penult: People Associated with Project 11111 I \• _ 0.00 NIA 177.00 Permit Applicant Jose Muniz Owner MUNIZ, JOSE 746 N CLAUDINA ST Type Electrical Fixtures Qty Type Plumbing Fixtures Orly Mechanical Fixtures Oty Meter/Disc Sw - Under 600 V, up to 200 1 amps The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. T�PHEIM Oq< Cityof Anaheim O� i0 Building DIVISIOn F i DIED' Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 10-10-Ltd Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-5153) last Inspection -Final Only After Above Completed Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been soned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction ! Z Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mac.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service