233 N STARFIRE ST (2)Permit Types
SLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2024-04578
Issued: 08/30/2024
www.anaheirm.net/building
(714)765-0626
Quarter Section: 167
Site Address: 233 N STARFIRE ST, ANAHEIM, CA 92807
Legal Description: N TR 5332 BLK LOT 11
APN: 35913210
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
J7141 765 - 5153
Project Description: Residential Remodel: To change out (1) Shower w/tile. Electrical to change out (1) outlet. Mechanical to change out
(1) exhaust fan.
Living Area: Number of Stones: 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spnnklered:
Cool Roof. Total pass paid for Permit:
People Associated with Project:
Contractor EGM CONSTRUCTION 7221 GARDEN GROVE,SUITE D GARDEN GROVE, CA
Permit Applicant EDGAR GMONTANO, CEO 7221 GARDEN GROVE STE D GARDEN GROVE, CA 92841
Owner PRICE, CHERIE P TR C P 233 N STARFIRE ST
20,000.00
N/A
276.60
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Receptacle, switches, lights 1 Shower 1 Ventilation Fan - <= 300 cfm on single duct 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�h"Elm tq<
City of Anaheim O� iO
Building Division Z
u >
�OUNDEO te`'�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
U
Plumbing Final
-
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (GroundlUnderfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
I COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (CompactionlMembrane Reinf.)
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
%
-
Rough Duct (Mechanical)
Rough Mechanical
S 7-11
Rough Electrical
57-L1
-`& 7�
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
NE
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes Now
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sinned offl
Sewer
Water Engineering Backflow (Testable Only)
Water Service