Loading...
233 N STARFIRE ST (2)Permit Types SLD ELE MEC PLM X X X X Permit Number: BLD2024-04578 Issued: 08/30/2024 www.anaheirm.net/building (714)765-0626 Quarter Section: 167 Site Address: 233 N STARFIRE ST, ANAHEIM, CA 92807 Legal Description: N TR 5332 BLK LOT 11 APN: 35913210 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. J7141 765 - 5153 Project Description: Residential Remodel: To change out (1) Shower w/tile. Electrical to change out (1) outlet. Mechanical to change out (1) exhaust fan. Living Area: Number of Stones: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof. Total pass paid for Permit: People Associated with Project: Contractor EGM CONSTRUCTION 7221 GARDEN GROVE,SUITE D GARDEN GROVE, CA Permit Applicant EDGAR GMONTANO, CEO 7221 GARDEN GROVE STE D GARDEN GROVE, CA 92841 Owner PRICE, CHERIE P TR C P 233 N STARFIRE ST 20,000.00 N/A 276.60 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Receptacle, switches, lights 1 Shower 1 Ventilation Fan - <= 300 cfm on single duct 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�h"Elm tq< City of Anaheim O� iO Building Division Z u > �OUNDEO te`'� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final U Plumbing Final - Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (GroundlUnderfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) I COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) % - Rough Duct (Mechanical) Rough Mechanical S 7-11 Rough Electrical 57-L1 -`& 7� Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath NE Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes Now Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sinned offl Sewer Water Engineering Backflow (Testable Only) Water Service