Loading...
515 N CITRON ST (2)Permit Types BLD I ELE I MEC 1 PLM X Permit Number: BLD2021-04094 Issued: 09/16/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 62 Site Address: 515 N CITRON ST B (Second Unit) Legal Description: N TR 1119 LOT 32 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Reroof: Install (5) squares of composition shingles over existing first layer on to accessory dwelling unit. Valuation: $2,500.00 Construcion Types: N/A, , Total Fees paid for Permit: 340.50 People Associated with Project: Owner KARL SCHISLER 515 N CITRON ST ANAHEIM CA 92805-2415 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. - - 11170 PNpNEIM cq< City of Anaheim pk io Building Division �I a 0vNOEo gay^/ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Formslrrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed y / Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Saint.) Floor (Joist(Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Ill Sheat ' laphragm/Frame) _ Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mae & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mac.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service