Loading...
633 N DWYER DR (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-01374 Issued: 03/18/2024 www.anaheim.net/bullding (714)7654626 Quarter Section: 62 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 •5153 P� M 7 7' a' Site Address: 633 N DWYER DR, ANAHEIM, CA 92801 Legal Description: N TR 4156 BLK LOT 5 APN: 03448256 _- Project Description: Reroof: Remove and install (32) sq of composition shingles for the house and (6) sq of composition shingles for the detached garage Living Area: Number of Stories: i Valuabon: 27,300.00 Garage Area: Construction Types: NIA Carron Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Feu paid for Pennk: 376.55 People Associated with Project: Contractor ALL SERVICE ROOFING 11602 ANABEL AVE202011251212524980 GARDEN GROVE, CA 92708 Permit Applicant Frank Vazquez Owner BALCOM, FRANCIS H TR 633 N DWYER DR Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures C The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable lems have been signed Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwmg applicable items have been Underfloor Rough Gas Reinf.) Insulation (Raised Foundation in (Raised Foundation Or lvl 22 d Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear (Fire 2nd Floor Shear Roof (Sheathing/Diapl Masonry (Reinf./Bond Rough Plumbing (Top Rough Duct(Mechani Rough Mechanical Rough Electrical PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Rough COA/Mitagation Measures I I I Plumbing Inspections Framing 0 [ Y after Plbc Era Mec & Rrei Do nor tape or plaster until trip following apphcable tams have been signed Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business lays at i approval) Excludes New Exterior Plaster (Brown T-Bar (Struct., Ele., or h Grease Interceptor Backflow (Testable Service