729 N CLEMENTINE ST (2)Pennit Types
BLD
1 ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2023-00881
Issued: 09/20/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 71
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765 - 5153
Site Address: 729 N CLEMENTINE ST, ANAHEIM, CA 92805
Legal Description: N TR 336 BLK LOT 9
APN: 03425309
_•.
Project Description: Residential Remodel: 354 sq. ft. to remodel kitchen, convert den into bedroom #6 and bathroom #4 on first floor with
80 sq. ft. to convert hall space into new bathroom on second floor. (6bd/4bth)
Living Area: Number of Stories:
2 Valuation: 30,000.00
Garage Area:
Construction Types: VB
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Spnnklered: No
Cool Roof:
Total Fees paid for Permit: 3.054.60
People Associated with Project:
Permit Applicant SHARI WATSON
Owner RENNER RICHARD R & EVELYN A 729 N CLEMENTINE ST
Architect KENNETH G BROWN 25401 CABOT RD. #207201110051133129480 LAGUNA HILLS, CA 92653
Type Electrical Fixtures Oty Type Plumbing Fixtures
City Mechanical Fixtures Orly
Motors - up to 1 h.p. 1 Bath Tub
1 Gas System (outlets) 1
Receptacle, switches, lights 30 Dishwasher
1 Ventilation Fan - <= 300 clot on single duct 1
Garbage Disposal
1
Kitchen Sink
1
Lavatory
4
Shower
3
Water Closet
4
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
City of Anaheim PNPIAEIM fqC
OF�O
Building Division 'Z
�I 1>
• DVfyDED ish^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
�.
Cross Connection Control (714) 765.4280
Engineering Final (714) 7655126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned
Building Final (714 765-5153)
Last Inspection -Final Only Aker Above Completed
/s� y
Plumbing (GfOUOdltJnderflOOr Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
sinnedbeen
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
zJ
Rough Electrical-�-
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Fibg., Ele.. Mee. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struts., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sioned off
Sewer
Water Engineering Backflow (Testable Only)
Water Service