Loading...
729 N CLEMENTINE ST (2)Pennit Types BLD 1 ELE MEC PLM X X X X Permit Number: BLD2023-00881 Issued: 09/20/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 71 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 - 5153 Site Address: 729 N CLEMENTINE ST, ANAHEIM, CA 92805 Legal Description: N TR 336 BLK LOT 9 APN: 03425309 _•. Project Description: Residential Remodel: 354 sq. ft. to remodel kitchen, convert den into bedroom #6 and bathroom #4 on first floor with 80 sq. ft. to convert hall space into new bathroom on second floor. (6bd/4bth) Living Area: Number of Stories: 2 Valuation: 30,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: No Cool Roof: Total Fees paid for Permit: 3.054.60 People Associated with Project: Permit Applicant SHARI WATSON Owner RENNER RICHARD R & EVELYN A 729 N CLEMENTINE ST Architect KENNETH G BROWN 25401 CABOT RD. #207201110051133129480 LAGUNA HILLS, CA 92653 Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Orly Motors - up to 1 h.p. 1 Bath Tub 1 Gas System (outlets) 1 Receptacle, switches, lights 30 Dishwasher 1 Ventilation Fan - <= 300 clot on single duct 1 Garbage Disposal 1 Kitchen Sink 1 Lavatory 4 Shower 3 Water Closet 4 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. City of Anaheim PNPIAEIM fqC OF�O Building Division 'Z �I 1> • DVfyDED ish^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final �. Cross Connection Control (714) 765.4280 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned Building Final (714 765-5153) Last Inspection -Final Only Aker Above Completed /s� y Plumbing (GfOUOdltJnderflOOr Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have sinnedbeen 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical zJ Rough Electrical-�- Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Fibg., Ele.. Mee. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struts., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned off Sewer Water Engineering Backflow (Testable Only) Water Service