Loading...
927 S MANCOS PL BPermit Types BLD ELE MEC PLM X X I X I X Permit Number: BLD2023-02732 Issued: 03/13/2024 www.anaheim. neUbu ilding (714)765-4626 Quarter Section: 124 Site Address: 927 S MANCOS PL B, Anaheim, Legal Description: N TR 3825 BLK LOT 22 APN: 25336209. Project Description: (ADU) Residential Addition: 317 sq. ft. to convert portion of garage into studio accessory dwelling unit. (ST/1BA) REF BLD2024-00668 Living Area: 317 Number of Stones: 1 Valuation: 30,000.00 Garage Area: Construction Types: Via Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnkiered: No Cool Roof: Total Fees paid for Parmit: 2,486.36 People Associated with Project: Permit Applicant Isabel Cuevas Owner CUEVAS ISABEL SANDHLR NAVI 927 S MANCOS PL Engineer- Civil JEFFREY ALLAN ROBERTS 8325 FOOTHILL BLVD A SUNLAND, CA 91040 Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Cry New or total rewire - 1 or 2 family 317 Bath Tub 1 Mini Split (Exterior condenser) 1 Sub Panel/Temp Pwr- Under 600 V, up to 1 Garbage Disposal 1 Mini Split (room unit) 1 200 amps Ventilation Fan - <= 300 cfm on single duct 3 Kitchen Sink Lavatory Repair/Drainage Alteration/Vent Piping Sewer per 100 ft. Water Closet Water Distribution Water Main per 100 ft. 1 1 1 1 1 1 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. �PNElm cq Cityof Anaheim 04P `10 Building Division y > • AOVNDEO vsyk Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final W �- Mechanical Final -2 C�^rL-. Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) 10 � j Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final anal my After A Last Inspection -Final Only Aker Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS /Bu'Idin Inspections a,5,4 tq- �4tt JI"`f 'F-� -[�,�_-v Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) f7-'Lti &4ii : D o Underfloor Insulation (Raised Foundation Only) b�� Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have hiaen sinned fat Floor Shear 1 Z� Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) — Rough Plumbing (Top Out) 77 Rough Duct (Mechanical) Rough Mechanical / Rough Electrical r Rough COA/Mitagation Measures Plumbing Inspections /1 r Framing (Onfy after Plbg , Ele Mee. & Fire) Insulation (Sound/Energy Do not tape or plaster until the following applicable items have been signed Drywall '-EC5 DrywallPenetrations (Ele, Mec & Plbg) Interior Lath Exterior Lathri"Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 busmess days aftr approval) Excludes New�✓✓'•.�M,�Exterior Plaster (Brown Coat) G��✓`�rV"tT-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backfiow (Testable Only) Water Service