510 S GREENWICH ST (2)Permit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2024-02762
Issued: 08/19/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 33
Site Address: 510 S GREENWICH ST, ANAHEIM, CA 928(
Legal Description: N TR 9685 BLK LOT 11
APN: 12710129
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 766 - 5153
Project Description: Photovoltaic System: Install residential roof mounted solar system with (10) modules, (1) inverter, 100 amp
subpanel, 200 amp main service and (1) ESS.
Living Area: Number of Stories:
0 Valuation:
10,000.00
Garage Area:
Construction Types:
N/A
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
No
Cool Roof:
Total Fees paid for Permit:
1,101.30
People Associated with Project:
Permit Applicant Felicia Ronquillo
Owner MYUNG, DUK Y
510 S GREENWICH ST
Contractor SUNRUN
21 WORLDS FAIR DRIVE200807221505542300 SOMERSET, NJ 92614
Engineer- Civil Manouchehr Hakhamaneshi
303 N GLENOAKS BLVD #200 BURBANK, CA 91502
Type Electrical Fixtures Qty Type
Plumbing Fixtures City Mechanical Fixtures
Qty
ESS (Battery Storage) 1
Inverter 1
Meter/Disc Sw - Under 600 V, up to 200 n
amps
Sub Panel/Tamp Pwr - Under 600 V, up to 1
200 amps
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
S-h
City of Anaheim PNPHEIM �q`
OF io
Building Division i
>
• �DVND ED v8�n
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
I DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
p
{��
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signeu
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless q oned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service