134 S CONNIE CIRPermit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2023-06466
Issued: 01/05/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 134
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 134 S CONNIE CIR, ANAHEIM, CA 92806
Legal Description: N TR 6784 BLK LOT 9
APN: 26802209
Project Description: Photovoltaic System: Install residential roof mounted solar with (39) modules, (2) inverters, (1) ESS, (1) 125 amp
load center, (1) 100 amp load center and 200 amp meter upgrade.
Living Area: Number of Stories:
0 Valuation: 39,000.00
Garage Area:
Construction Types: VB
Camon Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof
Total Fees paid for Permit: 1,367.07
People Associated with Project:
Contractor SUNRUN
21 WORLDS FAIR DRIVE200807221505542300 SOMERSET, NJ 92614
Owner TRAN, THAI OUOC
134 S CONNIE CIR
Engineer- Civil James Matthew Walsh
Type Electrical Fixtures Oty Type
Plumbing Fixtures Dry Mechanical Fixtures Oty
ESS (Battery Storage) 1
Inverter 2
Meter/Disc Sw - Under 600 V, up to 200 1
amps
Sub Panel/Temp Pwr- Under 600 V. up to 2
200 amps
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
lNPHEIM ��C
Cityof Anaheim D� iO
Building Division ? i
u '
�OVNDED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
MLLL
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed-
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subFloor of pour Floor slab until the follwing applicable items have beensigned
-
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
h�
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg . Fie _ Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec 8 Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar jStruct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service