Loading...
714 N CLAUDINA ST (2)Permit Types BLD ELE ME C PLM X Permit Number: BLD2023-06468 Issued: 12/06/2023 www.a na heim. net/buildi ng (714)765-4626 Quarter Section: 82 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 714 N CLAUDINA ST, ANAHEIM, CA 92805 - Legal Description: N TR 158 BLK B LOT 12 APN:03508411 Project Description: Retool: Remove and Install (20) squares of composition shingles over house. Living Area: Numberof5todes: 0 Valuation: 8,000.00 Garage Area: Construction Types: N/A CarportArea: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit 351.04 People Associated with Project: Permit Applicant Maria Rodriguez Owner MARTINEZ RODRIGUEZ, MARIA 714 CLAUDINA ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. �I,HEIM Cq Cityof Anaheim O4 t'0 Building Division F 2 �oVNOED tag^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (GroundlUnderfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subduer or pour floor slab until the folkving applicable items have been Building Final (714 766-5153) Last Inspection -Final Only After Above Completed �Z'�ct12 KI�.I vS Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) nn W Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele.. Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Backillow (Testable Only) Water Service