611 S CLAUDINA STPermit Types BLD ELE I MEC FILM X Permit Number: BLD2024-03854 Issued: 07/26/2024 www.analreim.net/building (714)765-4626 Quarter Section: 82 Site Address: 611 S CLAUDINA ST, Anaheim, CA 92805 Legal Description: N TR 135 BLK 1 LOT 10 APN: 03509510 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Reroof: Remove and install (24 ) sq of composition shingles over the entire house only Living Area: Number of Stories 1 Valuation: Garage Area: construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Contractor EPIC ROOFING AND EXTERIOR UPGRADES 29 99 W BURBANK BOULEVARD STE D BURBANK, CA Permit Applicant Natalie Hernanadez Owner Tim Nguyen 611 S Claudine at 7,000,00 NIA 349.91 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. NPHEIM cq Cityof Anaheim DAP C/O Building Division ti i U > • OVNDEo t8h^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 7655126 Fire Sprinkler (ONLY) (714) 765-5041 INSPECTION DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub LIsVBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beena dried Building Final (714 765.5153) Last Inspection -Final Only After Above Completed IIJf.�y 1 ` 11 �RI Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned let Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Z v Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor hackfill signed off) (Do not unless Sewer Water Engineering Backflow (Testable Only) Water Service