611 S CLAUDINA STPermit Types
BLD
ELE
I MEC
FILM
X
Permit Number: BLD2024-03854
Issued: 07/26/2024
www.analreim.net/building
(714)765-4626
Quarter Section: 82
Site Address: 611 S CLAUDINA ST, Anaheim, CA 92805
Legal Description: N TR 135 BLK 1 LOT 10
APN: 03509510
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: Remove and install (24 ) sq of composition shingles over the entire house only
Living Area: Number of Stories 1 Valuation:
Garage Area: construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit:
People Associated with Project:
Contractor EPIC ROOFING AND EXTERIOR UPGRADES 29 99 W BURBANK BOULEVARD STE D BURBANK, CA
Permit Applicant Natalie Hernanadez
Owner Tim Nguyen 611 S Claudine at
7,000,00
NIA
349.91
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
NPHEIM cq
Cityof Anaheim DAP C/O
Building Division ti i
U >
• OVNDEo t8h^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 7655126
Fire Sprinkler (ONLY) (714) 765-5041
INSPECTION
DATE
I INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub LIsVBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beena dried
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
IIJf.�y
1 ` 11
�RI
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been stoned
let Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Z
v
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
hackfill signed off)
(Do not unless
Sewer
Water Engineering Backflow (Testable Only)
Water Service