120 N TREVOR STPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-04487
Issued: 08/2712024
www.anaheim.net/building
(714)765-4626
Quarter Section: 141
Site Address: 120 N TREVOR ST, ANAHEIM, CA 92806
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
17141766 - 5153
Legal Description: N TR 4321 BLK LOT 9
APN: 26807128j
Project Description: Reroof: Remove and install (34) squares of composition shingles over house and attached garage
Living Area: Number of Stones: 0 Valuation: 5,30000
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Spnnklered:
Cool Roof: Total Fees paid for Permit: 383.69
People Associated with Project:
Permit Applicant Jerry Ngo
Owner Jerry Ngo 120 N. Trevor St
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNPHEIM C7(
Cityof Anaheim O4 iO
Building Division Z
DONDED tsa1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 7655126
INSPECTION
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7655041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwmg applicable items have been
sioned
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
9
I
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof heathin /Diaphragm/Frame)
�t
Masonry (Reinf /Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless s aned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service