Loading...
120 N TREVOR STPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-04487 Issued: 08/2712024 www.anaheim.net/building (714)765-4626 Quarter Section: 141 Site Address: 120 N TREVOR ST, ANAHEIM, CA 92806 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 17141766 - 5153 Legal Description: N TR 4321 BLK LOT 9 APN: 26807128j Project Description: Reroof: Remove and install (34) squares of composition shingles over house and attached garage Living Area: Number of Stones: 0 Valuation: 5,30000 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: 383.69 People Associated with Project: Permit Applicant Jerry Ngo Owner Jerry Ngo 120 N. Trevor St Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNPHEIM C7( Cityof Anaheim O4 iO Building Division Z DONDED tsa1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 7655126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwmg applicable items have been sioned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed 9 I Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof heathin /Diaphragm/Frame) �t Masonry (Reinf /Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless s aned off) Sewer Water Engineering Backflow (Testable Only) Water Service