229 S MALL WAY (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-05223
Issued: 10/01/2024
www.anaheim. netlbuilding
(714)765-4626
Quarter Section: 27
Site Address: 229 S MALL WAY, ANAHEIM, CA 92804
Legal Description: N TR 1940 BLK LOT 90
APN: 12704439
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 • 5153
Project Description: Remof: Remove and install (26) sq of composition shingles over the house, no flat
pNl:;l
i
/ � A
Bey /
Living Area:
Number of Stones:
1 valuation: 22,500.00
Garage Area:
Construction Types: N/A
carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
Cool Roof:
Total Fee. paid for permit: 361.93
People Associated with Project:
Contractor
PREFERRED ROOFING
3419 VIO LID0201903210916593850 NEWPORT.BEACH, CA 92665
Permit Applicant
Eric Jacoby
Owner
NGUYEN, LISA TR L & L
229 S MALL WAY
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanics[ Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim OI1N^HEIM (q<'O
Building Division r' Z
'
• A, IVDED v9`'^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
-INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 7665126
INSPECTION
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 7665194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
-
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been siQned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
(O 9
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do backfill unless v,ned off)
not
Sewer
Water Engineering Backflow (Testable Only)
Water Service
l l I1 l tl \\.\111.1N1
ItUll lit �i. lit PLR I%II.N1
f
BUILDING DIVISION
2016 (:A1.IFORNIA (01)[A
01/01/2017
SMOKE DETECTORS AND CARBON MONOXIDE SELF CERTIFICATION
Permit Number.. )� ?�S 1 1 Date b f 1
Project address ;) 2
Property Owner L;AA hpS j(N
The undersigned dons hereby cedi y that I am the property owner of the above referenced
property I further certify that smoke alarms and carbon monoxide alarms are present and
functional in all the following locations. All boxes must be checked below
d Smoke Alarms and Carbon Monoxide Alarm On the ceiling or wall outside of each separate
sleeping area in the immediate vicinity of bedroom/s or in each hallvrey outside of the rooms.
(Smoke Alarms. In each room used for sleeping purposes.
DI/Smoke Alarm and Carbon Monoxide Alarm: In each story, including any habitable basement.
(Note. in dwellings or dwelling units with split levels and without an intervening door between
the adjacent levels, a smoke alarm and a carbon monoxide detector installed on the upper level
shall suffice for the adjacent lower level provided that the lower level is less than one full story
below the upper level.)
All dwelling units with attached garages require carbon monoxide detectors.
Signature Date 10/08/2024
California Residential Code (CRC) Section R31 '.2.CRC R315.2 slates in Part trial existing dwellings be
retrofitted with smoke detectors and carbun monoxide detectors when a building perrnit is issued fni work on or
in a building that Is valued at S1.000 or more ' CRC Section R314 3, CRC R315 2 defines required locations as
nd,cled above
NO IF This certification is only used when normal access to the Interior of the dwelling by the City of Anaheim
Inspector is not achieved during the course of project construction It is normally used for exterior projects such
as re -roofing. re -siding, patio covers solar photovoltaic installations, and similar exterior construction work
200 5 Anaieeon 61rd Su. in 145 Ariahemi CaLhxma 92805 i 714i765-5153 PJ,me 1114 i76•r 41,07 Fax I FES 7n10
waw anaheun neLrunamg B842