Loading...
911 S BRIANNA WAY (2)(" Permit Types BLD ELE MEG I PLM X x Permit Number: BLD2024-04726 Issued: 10/03/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 215 SNe Address: 911 S BRIANNA WAY, ANAHEIM, CA 92808 Legal Description: N TR 12685 BLK LOT 35 APN: 35655302 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765-5153 �y1Ll� 4a Project Description: Photovoltaic System with Micro -Inverters: Tying into existing residential roof mounted solar system (11) modules and (11) micro -inverters (BLD2022-03087) Living Area: Number of Stories: 0 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spdnklered: Cool Roof: Total feu paid for Permit: People Associated with Project: Contractor MY SMART HOUSE LLC 39809 AVENIDA ACACIAS STE D MURRIETA, CA Permit Applicant Jose Bahena 39809 Avenida Acacias Suite D Murriets, CA 92563 Owner DYAK, FLETCHER 911 S BRIANNA WAY 8,954.00 vB 743.00 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City Microinverter 11 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PHEIM Cq( City of Anaheim O� iO Building Division F y u > E `g5 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been -sinned Building Final (714765.5153) Last Inspection -Final Only After Above Completed �J( Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unleq� sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service