Loading...
204 N FINCH STi F Permit Types BLD I ELE TiiC PLM X X Permit Number: BL02024-03853 Issued: 07/26/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 162 Site Address: 204 N FINCH ST, ANAHEIM, CA 92807 Legal Description: N TR 5591 BILK LOT 75 APN: 35912237 CITY OF ANAHEIM BUILDING DIVISION 200 $. ANAHEIM BLVD. (714) 765 - $153 Fv1 Project Description: Residential Photovoltaic System - Microinverters (without ESS) Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Root: Number of Stories: 7' Z9 2- Valuation: 8,140.00 Construction Types: Ocwpancy Groups: Fire Sprinklered. Total Fees paid for Permit: 172.00 People Associated with Project: Contractor MY SMART HOUSE LLC 39809 AVENIDA ACACIAS STE D MURRIETA, CA Permit Applicant Jose Bahena 39809 Avenida Acacias Suite D Murneta, CA 92563 Type Electrical Fixtures Cry Type Plumbing Fixtures Qty Mechanical Fixtures Microinverter 10 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�pHEIM CSC City of Anaheim OF iO Building Division F Z �OVNDED v84^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5D41 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub LisUBus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been staned Building Final (714 765.5153)�" Last Inspection -Final Only After Above Completed r'' ' Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec-) Grease Interceptor (Do not backfill unless s oned off) Sewer Water Engineering Backflow (Testable Only) Water Service