Permit Number: BLD2020-02946
Issued: 03/22/2022
www.a na hei m. net/bu ildi ng
(714)7654626
Quarter Section: 87
Sib Address: 400 W DISNEY WAY, ANAHEIM, CA 92802
Legal Description:
APN:08255115
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765 - 5153
Project Description: Non Residential Addition: 526 sq ft to create new public restroom at existing second level deck.
Living Area:
Number of Stories:
3 Valuation:
100,000.00
Garage Area:
Construction Types:
IA
Carport Area:
Occupancy Groups:
B
Balcony I Deck Area:
Fire Spnnidered:
yes
Cool Roof:
Total Fen paid for Parma:
9.697.29
People Associated with Project:
Contractor BERGERON CONSTRUCTION &: DESIGN 223 RODEO RD2014111714204D6053 GLENDORA, CA 91745
Permit Applicant Paul Bergeron
Type Electrical Fixtures
Dry Type Plumbing Fixtures
Ory Machanial Fixtures
City
Receptacle, switches, lights
17 Drinking Fountain
2 Ventilation Fan - <- 300 con on single duct
2
Floor Drain
2
Lavatory
4
Rainwater, Overflow Drains
2
Sewer per 100 ft.
1
Urinal
2
Water Closet
8
The Permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
Pa Pt{EIM t.,C
Cityof Anaheim D� io
Building Division F i
>
�oUNDED T
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
11��
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Under0oor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodeftJfer
Sub Llst/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
uilding Ins actions
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reint.)
Floor (JoisUGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1 st Floor Shear igpq
JSC
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
V Z H
Masonry (ReinfJBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
-T `'1
.� SG
Rough Duct (Mechanical)
Rough Mechanical /
J 7 H
J SG
Rough Electrical I
S ? M
J,SG
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
% a�
JSC
Do not tape or plaster until the following applicable items have been signed:
Drywall
'3
Drywall Penetrations (Ele. Mec & Plbg)
Interior Lath
Exterior Lath
%`7 a%%
j
5G
Electrical Inspections
Electrical Service Meter-tMeter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct, Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service