Loading...
400 W DISNEY WAYPermit Types BLD ELE MEC PLM X X X X Permit Number: BLD2020-02946 Issued: 03/22/2022 www.a na hei m. net/bu ildi ng (714)7654626 Quarter Section: 87 Sib Address: 400 W DISNEY WAY, ANAHEIM, CA 92802 Legal Description: APN:08255115 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 - 5153 Project Description: Non Residential Addition: 526 sq ft to create new public restroom at existing second level deck. Living Area: Number of Stories: 3 Valuation: 100,000.00 Garage Area: Construction Types: IA Carport Area: Occupancy Groups: B Balcony I Deck Area: Fire Spnnidered: yes Cool Roof: Total Fen paid for Parma: 9.697.29 People Associated with Project: Contractor BERGERON CONSTRUCTION &AMP: DESIGN 223 RODEO RD2014111714204D6053 GLENDORA, CA 91745 Permit Applicant Paul Bergeron Type Electrical Fixtures Dry Type Plumbing Fixtures Ory Machanial Fixtures City Receptacle, switches, lights 17 Drinking Fountain 2 Ventilation Fan - <- 300 con on single duct 2 Floor Drain 2 Lavatory 4 Rainwater, Overflow Drains 2 Sewer per 100 ft. 1 Urinal 2 Water Closet 8 The Permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. Pa Pt{EIM t.,C Cityof Anaheim D� io Building Division F i > �oUNDED T Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 11�� Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Under0oor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodeftJfer Sub Llst/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS uilding Ins actions Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reint.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1 st Floor Shear igpq JSC Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) V Z H Masonry (ReinfJBond Beam/Pre-Grout) Rough Plumbing (Top Out) -T `'1 .� SG Rough Duct (Mechanical) Rough Mechanical / J 7 H J SG Rough Electrical I S ? M J,SG Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) % a� JSC Do not tape or plaster until the following applicable items have been signed: Drywall '3 Drywall Penetrations (Ele. Mec & Plbg) Interior Lath Exterior Lath %`7 a%% j 5G Electrical Inspections Electrical Service Meter-tMeter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct, Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service