200 N CAROUSEL ST (7)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-05258
Issued: 10/02/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 122
Site Address: 200 N CAROUSEL ST, ANAHEIM, CA 92806
Legal Description: N TR 3390 BILK LOT 85
APN: 26828303
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Project Description: Reroof: To remove and install (25) squares of composition shingles over house and attached garage
L'
Living Area:
Number or Stories:
1 Valuation: 12,500.00
Garage Area:
Construction Types: VB
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permft: 360.63
People Associated with
Project:
Contractor
BRONCO ROOFING INC
1355 S LA BREA AVEABCDE11120928 LOS ANGELES, CA 92865
Permit Applicant
Theresa Delaney
Owner
SEMINARA, PHILIP CHARLES JR TR
200 N CAROUSEL ST
Type Electrical Fixtures City Type Plumbing Fixtures Cry Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
�pHEIM c-1
Cityof Anaheim O� P C��O
Building DIVISION F y
>
- �OVNDEO t51%
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7664041
Plumbing (GroundfUnderfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground ElectrodefUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklFormsfTrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
sione
Building Final (714 7655153)
last Inspection -Final Only Aker Above Completed
t
tfo
Zd
�l
n
1(1VP
Plumbing(GroundfUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistfGirdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathingfDiaphragmfFrame)
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)