Loading...
712 N PAULINE ST BPermit Types BLD ELE MEC PLM X X Permit Number: BLD2023-01171 Issued: 03/10/2023 www.anaheim.net/building (714)765.4626 Quarter Section: 82 Site Address: 712 N PAULINE ST B, Anaheim, CA 92805 Legal Description: N TR 247 BLK D LOT 4 APN: 03515513 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANANEIIRBLVD.n ' (714) 765 - 5153 Project Description: Photovoltaic System with Micro -Inverters: Install roof mounted solar system with (10) modules and (10) micro -inverters and 125 Amp load center for new detached construction ADU. (REF:BLD2022-04893 & BLD2022-04894) Living Area: Number of Stories: i Valuation: Garage Are& Construction Type.: carport Area: Ocoupency, Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees Feld for Parme: People Associated with Project: Contractor SWSS ELECTRICAL 13752 HARBOR BLVD GARDEN GROVE. CA 92843 Permit Applicant Paul Le Owner MEDINA JOSE F & RITA 712 N PAULINE ST 0.00 Ve 255.00 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Qty Microinverter 10 Sub Panel/Temp Pwr - Under 600 V, up to 1 200 amps The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. 'NPHEIM ��< Cityof Anaheim OF �O Building Division F 2 u > • �OV/yD ED tad^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final tt Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sioned Building Final (714 765-6153) Last Inspection -Final Only After Above Completed lfVy�L„I I M/ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Flbg., Ele.. Mec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New rnnatriirtinn Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service