712 N PAULINE ST BPermit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2023-01171
Issued: 03/10/2023
www.anaheim.net/building
(714)765.4626
Quarter Section: 82
Site Address: 712 N PAULINE ST B, Anaheim, CA 92805
Legal Description: N TR 247 BLK D LOT 4
APN: 03515513
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANANEIIRBLVD.n '
(714) 765 - 5153
Project Description: Photovoltaic System with Micro -Inverters: Install roof mounted solar system with (10) modules and (10)
micro -inverters and 125 Amp load center for new detached construction ADU. (REF:BLD2022-04893 & BLD2022-04894)
Living Area: Number of Stories: i Valuation:
Garage Are& Construction Type.:
carport Area: Ocoupency, Groups:
Balcony / Deck Area: Fire Spnnklered:
Cool Roof: Total Fees Feld for Parme:
People Associated with Project:
Contractor SWSS ELECTRICAL 13752 HARBOR BLVD GARDEN GROVE. CA 92843
Permit Applicant Paul Le
Owner MEDINA JOSE F & RITA 712 N PAULINE ST
0.00
Ve
255.00
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Qty
Microinverter 10
Sub Panel/Temp Pwr - Under 600 V, up to 1
200 amps
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
'NPHEIM ��<
Cityof Anaheim OF �O
Building Division F 2
u >
• �OV/yD ED tad^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
tt
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
sioned
Building Final (714 765-6153)
Last Inspection -Final Only After Above Completed
lfVy�L„I
I
M/
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Flbg., Ele.. Mec & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
rnnatriirtinn
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service