Loading...
114 S OLYMPIA CTPermit Types BLD ELE MEC PLM X Permit Number: BLD2022-05065 Issued: 10124/2022 C,2y_ZLI JEYta -ID www.anaheim.neVbuildin�gJ fe V*U "�-✓ " (714)765-4626 Quarter Section: 112 Site Address: 114 S OLYMPIA CT, ANAHEIM, CA 92806 Legal Description: N TR 5081 BLK LOT 41 APN: 08303143 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. I7141 765 - 5153 Project Description: Patio Cover: 480 sq ft attached solid patio cover. Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: People Associated with Owner Juan CadosMadrigal MADRIGAL JUAN C Number of Stories: 0 Valuation: 3,500.00 Construction Types: NIA Occupancy Groups: Fire SpnriklereB. No Total Fees paid for Permit. 485 74 114 S OLYMPIA CT Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�P14EIM Cq` Cityof Anaheim OF iO Building Division F i ��VNDED tshn Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical FinalEXPIRE Cross Connection Control (714) 7 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7 9Q 4 ff Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) `P3,4CE: Z 3 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FOrmslTrenches (Footings) COA/Migation Measures Do nol install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/DiaphragmlFrame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Plbg Ele Mec & Fire) Insulation (Sound/Energy) Do nol tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service