Loading...
737 N MAVIS ST 1-4 (3)Permit Types BLD ELE MEC PLM CITY OF ANAHEIM X BUILDING DIVISION Permit Number: BLD2024-05031 200 S. ANAHEIM BLVD. Issued: 09/26/2024 (714) 765. 5153 www.anaheim.net/building (714)765-4626 Quarter Section: 82 Site Address: 737 N MAVIS ST 1-4, ANAHEIM, CA 92805 Legal Description: TR 3051 LOT 1 AND LOTS 2 TO 11 INC APN: 03520412 Project Description: Restucco 372 square feet of exterior wall. REF: BLD2004-03918 Living Area: Number of Stones: 0 Valuation: Garage Area: Construction Types: CarportArea: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Raaf: Total Fees paid for Permit: People Associated with Project: Permit Applicant lonut Rus Owner STRATTFORD MAVIS LLC 18831 VON KARMAN AVE 350 1,682.00 VN No 711.00 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PNeIM Cq` Cityof Anaheim O� iO Building Division _� z U ' �o_Noep �a�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (7al Only After Last Inspection -Final Only Aker Above Completed IZ1'Z C \SrhIV Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Be., Mec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do backfill umes,,,,aned off) not Sewer Water Engineering Backflow, (Testable Only) Water Service