Loading...
131 S TOPO ST (2)Permit Types BLS ELE MEC PLM X Permit Number: BLD2024-05207 Issued: 09/30/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 27 Site Address: 131 S TOPO ST, ANAHEIM, CA 92804 Legal Description: N TR 1940 BLK LOT 129 APN: 12703312 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Reroof: To remove and install (26) squares of composition shingles over house and attached garage Living Area: Number of Stones: 1 Valuation: Garage Area: Construction Types: CarportArea: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fee. pald for Parma: People Associated with Project: Permit Applicant Thuy Nguyen Owner NGUYEN, THUY THU 131 S TOPO ST ti NNEIM t 9,500.00 N/A 361,24 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. ,, w �PHEIM cd ,,City of Anaheim DF P �� o Building DIVISIOn r? i u > • �OVNDED ts�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Lifer Sub LIstlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714765.5153) Last Inspection -Final Only After Above Completed �t��11�Z1 (Orc.r Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been siamed list Floor Shear Firespdnkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) 6k Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec 8: Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service BUILDING DEPARTMENT 2016 CALIFORNIA CODES 200 S. Anaheim Blvd., Suite 145 CODE CrCC Anaheim, CA 92805 01/01/2017 714 765-5153 EFFECTIVE DATE www.anaheim.net/building SMOKE DETECTORS AND CARBON MONOXIDE SELF CERTIFICATION • Final innyspectipproval will require this completed form to be on site along with the job card. Permit Number: - o5y I Date: to fti 14 Project address: Lit S T003 S Property Owner: The unde igned does h reby ceTtify ffiat I am the property owner of the above referenced property. I further certify that smoke alarms and carbon monoxide alarms are present and functional in all the following locations. All boxes must be checked below ❑ Smoke Alarms and Carbon Monoxide Alarm: On the ceiling or wall outside of each separate sleeping area in the immediate vicinity of bedroom/s or in each hallway outside of the rooms. ❑ Smoke Alarms: In each room used for sleeping purposes. ❑ Smoke Alarm and Carbon Monoxide Alarm: In each story, including any habitable basement; (Note: in dwellings or dwelling units with split levels and without an intervening door between the adjacent levels, a smoke alarm and a carbon monoxide detector installed on the upper level shall suffice for the adjacent lower level provided that the lower level is less than one full story below the upper level.) All dwelling units with attached garages require carbon monoxide detectors. Signature: 1 California Residential Code (CRC) Section R314.6.2,CRC R315.2 states in part that existing dwellings be "retrofitted with smoke detectors and carbon monoxide detectors when a building permit is issued for work on or in a building that is valued at $1,000 or more." CRC Section R314.3, CRC R315.2 defines required locations as indicted above. NOTE: This certification is only used when normal access to the interior of the dwelling by the City of Anaheim Inspector is not achieved during the course of project construction. It is normally used for exterior projects such as re -roofing, re -siding, patio covers, solar photovoltaic installations, and similar exterior construction work. 200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax FEB 2018 www.anaheim.net/building B842 SMOKE/ CO ALARM REQUIRED LOCATIONS Bedroom Bedroom OD BaN nn 6 I Bedroom Kitchen n Living Room �! 1 Figure t Attic 6 Bedroom Living Room 6 Basement Family Room Bedroom Dining Living Room Kitchen Bedroom N Bedroom Figure 2 Bedroom Kitchen Figure 3 y� REQUIRED SMOKE ALARM LOCATION CO REQUIRED CARBON MONOXIDE ALARM LOCATION a• Acceptable l Here Never - Here err Top of Detector Acceptable Here Wall Figure 4 Garage