236 S EMPIRE STPermit Types
BUD ELE MEC PLM CITY OF ANAHEIM
X
BUILDING DIVISION
Permit Number: BLD2024-05083 200 S. ANAHEIM BLVD.
Issued: 09/24/2024 (714) 765. 5153
www.anaheim.net/building
(714)7654626
Quarter Section: 40
Site Address: 238 S EMPIRE ST, ANAHEIM, CA 92804
Legal Description: N TR 2299 BLK LOT 199
APN: 12803413
Project Description: Patio Cover: 460 sq It attached patio cover
Living Area: Number of Stories: 0
valuation:
Garage Area:
Construction Types:
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Spnnklered:
Cool Roof: Total
Fees paid for Pernik:
People Associated with Project:
Contractor GOLDEN STATE AWNING 13281 BLACK DEER DR CORONA, CA
Permit Applicant ARI ERESENDIZ PEREZ, OWNER 13281 BLACK DEER DR CORONA, CA 92883
Owner NGUYEN, THUY DIEM 238 S EMPIRE ST
�NNHEI C _\
�r P
/r�I�NUEV vat^
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures
0ao
NIA
No
472.32
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
a P�f,HEtM �q<
City of Anaheim
O� iO
Building Division f i
' >
• IoNDEO vas^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-6126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
i n
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections \\ l
r O h I L4
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been stared
tat Floor Shear
Firesprinkler(Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation(Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless , ned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service