884 W LINCOLN AVEPermit Types
BID
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2022-02115
Issued: 08/01/2022
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
www.anaheim.net/building
(714)7654626
Quarter Section: 63
Site Address: 884 W LINCOLN AVE, ANAHEIM, CA 92805
Legal Description: A TR BURKLES SUB BILK LOT 3 BURKLES SUB LOT 3 POR O
APN: 03611326
Project Description: Change Of Use: 1.235 sf. to convert existing retail store (M) to new meat market (M) with electrical, mechanical and
plumbing.
Living Area:
Number of Stories: 1
Valuation:
24.800.00
Geroge Area:
construction Types:
IIIB
Carport Area:
Occupancy Groups:
M
Balcony I Deck Area:
Fire Sonklered:
Cool Roof:
Total Fees paid for Perma:
3,112.29
People Associated with Project:
Permit Applicant OSCAR AMEGA
Owner DASKALAKtS KONSTANTINOS
TR DASKALA PO BOX 3880
Engineer -Mechanical NAJID JAZAVERI
PLEASANTON, CA 94566
Type Electrical Fixtures
Oty
Type Plumbing Fixtures
Oty Mechanical Fixtures
City
Motors - Factory Wired Appliance, up to 1
4
Floor Drain
2 Ventilation Fan - <= 300 cfrn on single duct
1
hp.
Floor Sink
3
Receptacle, switches, lights
18
i
Gas System (outlets)
1
Sub Panel/Temp Pwr - Under 600 V, up to
200 amps
Kitchen Sink
3
Lavatory
1
Repair/Drainage AherationlVenl Piping
1
Service, Mop, Slop Sink
1
Water Closet
1
Water Distribution
1
Water Heater
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
City of Anaheim P�PHEIM �q`
D4 i0
Building Division F z
>
�gGA'DED tag^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
I DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
ED
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION
DATE
TINSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
-
-
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklForms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or poor Floor slab until the fallwing applicable items have been
i n
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following appboable items have
been signed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing IOnly after fling Ele Mec & F re)
Insulation (Sound/Energy)
Do not tape or plaster unitl the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service